search menu icon-carat-right cmu-wordmark

Interpreting CMMI High Maturity for Small Organizations 2008

Presentation
Presented in September 2008 by Robert Stoddard at the International Congress of Software Engineering and its Applications.
Publisher

Software Engineering Institute

Subjects

Abstract

Agenda:

  • Why This Workshop?
  • Introduction to CMMI Process Performance Models and Baselines
  • Contrasting Large vs Small Organizational Settings
    • 1. Project Lifecycle Needs
    • 2. Performance Outcomes (“y’s”)
    • 3. "x" Factors (controllable and un-controllable)
    • 4. Usage of Models
    • 5. Analytical Methods
    • 6. Training and Deployment
    • 7. Sponsorship and Participation

Please note that current and future CMMI research, training, and information has been transitioned to the CMMI Institute, a wholly-owned subsidiary of Carnegie Mellon University.