Software Engineering Institute Carnegie Mellon

Course Offerings
By Category
By Date
By Name
By Location
Prices
Locations, Travel, and Lodging
Courses FAQ
Privacy Information (FERPA)
Registration
Contact Information
Credentials Program
SEI Certification

Improving Process Performance Using Six Sigma

Dates

2007/2008* Prices (USD)

Remaining 2007 Dates
December 3-7, 2007 (SEI Frankfurt, Germany)



2008 Dates
February 25-29, 2008 (SEI Pittsburgh, PA)
March 31-April 4, 2008 (SEI Frankfurt, Germany)
June 2-6, 2008 (SEI Arlington, VA)
October 20-24, 2008 (SEI Pittsburgh, PA)

Course Registration
Software Engineering Institute
Carnegie Mellon University
Pittsburgh, PA 15213-3890
Phone: 412 / 268-7388
FAX: 412 / 268-7401
Questions: courseregistration@sei.cmu.edu
To Register: 2007 Click Here

To Register: 2008 Click Here

This course may also be offered by arrangement at customer sites. E-mail course-info@sei.cmu.edu or call +1 412-268-7622 for details.

*Course dates and fees are subject to change.

U.S.
Course Fee:
Industry: $2625
Government: $2100
Academic: $2100

International
Course Fee:
$5250

    Register for
2007 Dates


   Register for
2008 Dates

Course Description

 

Please note the prerequisites below: you must bring a laptop computer, and you must install and test your student version of a statistical package before the course, according to instructions in the pre-course student letter.

This five-day course takes a hands-on, problem-solving approach to data analysis, providing participants with a toolkit of analysis methods and leveraging industry best practices such as Six Sigma and Goal-Driven Software Measurement. Key concepts in data analysis - including statistical thinking, the 7 Basic Tools, and root cause analysis, are introduced through lectures and extensive practice sessions using real-life case studies and project data. Participants learn a framework in the form of tools, methods, and practices for analyzing data to make more informed business decisions about project and process performance, quality, schedule, and cost. The ways in which these quality measurement practices relate to improvement models such as Capability Maturity Model® Integration (CMMI®) are also discussed.

Note: This course was formerly called Measuring for Performance-Driven Improvement I.

Audience   ·    Prerequisites    ·    Objectives   ·    Logistics

 

AUDIENCE

  • software engineering process group members
  • process improvement working group members
  • software measurement team members
  • Six Sigma black belts, green belts, or belt candidates
  • professionals seeking better ways to analyze quantitative data in support of process improvement within organizations and projects
  • project managers and process managers

PREREQUISITES
Before registering for this course, participants must

  • be familiar with measurement projects or processes from their home organization
  • be familiar with establishing a measurement infrastructure, particularly using Goal-Driven Measurement

Before attending this course, participants must

  • install their student license of a statistics package, identified in the student pre-course letter, and confirm that the software opens and functions
  • read the background material on earned value measurement, Goal-Driven Measurement, and the SEI's Goal-Question-(Indicator)-Metric (GQ[I]M) methodology sent to them

Required Equipment

Students must bring a personal computer equipped with

  • Microsoft Windows 2000 Professional with Service Pack 3, Windows XP Home Edition with Service Pack 2, Windows XP Professional with Service Pack 2, or Windows Vista (tested on Windows Vista Enterprise, Business, Home Premium, and Home Basic editions)
  • Microsoft Excel 2000, 2002 (XP), 2003, or 2007
  • Microsoft Internet Explorer 6.0 or later
  • Microsoft .NET Framework 2.0 (or 3.0 with Windows XP versions or Vista)
  • Pentium-equivalent microprocessor (800 MHz or faster)
  • at least 512 MB of RAM
  • at least 88 MB of hard disk space for .NET Framework 2.0 and another 58 MB for .NET Framework 3.0 (if not already installed) and at least 400 MB for additional applications to be installed. (Note: Each of the first two components listed requires approximately twice the given amount of disk space during installation.)
  • CD-ROM drive or USB port
  • video graphics adapter and monitor with at least 1024x768 resolution
  • Adobe Acrobat Reader 6.0 or later

OBJECTIVES
Successful completion of this course will enable participants to

  • explore and navigate data to understand project, process, and product behavior, relationships and trends
  • use analysis methods to remove special causes of variation and stabilize processes
  • apply course concepts to CMMI to drive business benefit
  • select appropriately from among the data analysis methods learned in class
  • apply effective measurement & analysis techniques within a CMMI implementation

Course Materials
Students must bring a laptop computer with their student license of a statistics package installed (per instructions in the student pre-course letter).

LOGISTICS

Class Schedule
This five-day course meets at the following times:
Days 1-4, 8:30 a.m. to 5:00 p.m. (U.S. locations)
Day 5, 8:30 a.m. to 12:00 p.m. (U.S. locations)

Days 1-4, 9:00 a.m. to 5:30 p.m. (non-U.S. locations)
Day 5, 9:00 a.m. to 12:30 p.m. (non-U.S. locations)

Hotel and Travel Information
Information about traveling to the SEI offices is available on our
Travel and Lodging Web pages.

Questions about this course?
Please see our Frequently Asked Questions Web page for answers to some of the more common inquiries about SEI Education and Training.

If you need more information, contact us via e-mail at course-info@sei.cmu.edu or telephone at +1 412-268-7622.



 

 

Related Products and Services

 

Courses

Course Registration

 

  Register for 2007 Dates

  Register for 2008 Dates
 

^
TOP