Using CMMI to Improve Earned Value Management

For organizations using Earned Value Management (EVM) or that plan to implement EVM during Capability Maturity Model Integration (CMMI) implementation, this technical note provides guidance for cost-effective process improvement and appraisal. Mapping and comparison tables between CMMI and the U.S. national standard on EVM are provided. These tables can be used to identify practices within CMMI that are not included in the EVM standard but, if added to an organization's processes, will strengthen adherence to EVM principles. The tables also can be used to develop instruments that will provide evidence to an appraisal team to enable it to quickly verify and validate specific practices based upon effective implementation of EVM.

Furthermore, information such as glossary components, typical work products, and examples are included in this technical note to aid those using CMMI for process improvement. For organizations using technical performance measurement, a primary base measure for earned value, additional guidance and information is provided. Finally, additional references and an EVM glossary are provided.

PDF [124 KB]

Author

Paul Solomon

This report is related to the following area(s) of work:

Process Improvement
CMMI

Technical Note
CMU/SEI-2002-TN-016
October 2002

Cite This Report

SEI:

Solomon, Paul; Using CMMI to Improve Earned Value Management (CMU/SEI-2002-TN-016). Software Engineering Institute, Carnegie Mellon University, 2002. http://www.sei.cmu.edu/library/abstracts/reports/02tn016.cfm

IEEE:

P. Solomon, "Using CMMI to Improve Earned Value Management," Software Engineering Institute, Carnegie Mellon University, Pittsburgh, Pennsylvania, Technical Note CMU/SEI-2002-TN-016, 2002. http://www.sei.cmu.edu/library/abstracts/reports/02tn016.cfm

APA:

Solomon, P., (2002). Using CMMI to Improve Earned Value Management (CMU/SEI-2002-TN-016). Retrieved June 19, 2013, from the Software Engineering Institute, Carnegie Mellon University website: http://www.sei.cmu.edu/library/abstracts/reports/02tn016.cfm

CHI:

Solomon, Paul, Using CMMI to Improve Earned Value Management (CMU/SEI-2002-TN-016). Pittsburgh, PA: Software Engineering Institute, Carnegie Mellon University, 2002. http://www.sei.cmu.edu/library/abstracts/reports/02tn016.cfm

MLA:

Solomon, P., 2002. Using CMMI to Improve Earned Value Management (Technical Report CMU/SEI-2002-TN-016). Pittsburgh: Software Engineering Institute, Carnegie Mellon University. http://www.sei.cmu.edu/library/abstracts/reports/02tn016.cfm

Find Us Here

Find us on Youtube  Find us on LinkedIn  Find us on twitter  Find us on Facebook

Share This Page

Share on Facebook  Send to your Twitter page  Save to del.ico.us  Save to LinkedIn  Digg this  Stumble this page.  Add to Technorati favorites  Save this page on your Google Home Page 

For more information

Contact Us

info@sei.cmu.edu

412-268-5800

Help us improve

Visitor feedback helps us continually improve our site.

Please tell us what you
think with this short
(< 5 minute) survey.