icon-carat-right menu search cmu-wordmark

September 2005 CMMI Performance Results

Presentation
The process maturity profile for CMMI, from September 2005.
Publisher

Software Engineering Institute

Topic or Tag

Abstract

Introduction : Purpose

  • Characterize the adoption of CMMI
  • Describe results from Standard CMMI Appraisal Method for Process Improvement (SCAMP), v1.1 Class A appraisals using Capability Maturity Model Integration (CMMI) v.1.
  • Encourage continued reporting of results

*This report does not include organizations previously appraised against CMMI v.0 and which have not reappraised against v1.1.

Please note that current and future CMMI research, training, and information has been transitioned to the CMMI Institute, a wholly owned subsidiary of ISACA.